Now why don't the SWA guys answer the questions instead of change the subject?
Why not follow the process agreement which was laid out? It appears the AT side is. It appears to an outsider SWAPA fears an equitable integration which will be more likely with arbritration. Am I right?
Schwanker, the reason why I asked for a copy of the 4 party process agreement is to see if both sides are following the agreement. You're assuming that the process is being followed by AT. I'm not as confident with that assessment.
There has already been one AirTran pilot who posted that they were insulted by some of the wording in the process agreement. That was a red flag to me.
Those of us on the outside have no idea what's in the language of the document so let's not jump to the conclusion that the agreement is currently being followed by either side. On the same note, don't assume that there's no escape door in the agreement. There's almost always an escape door.
As for fear of arbitration, this is one that could produce a strange result. I'm willing to stick my neck out and predict that it'll be somewhere between a stapling of SWA pilots below all Airtran pilots and a stapling of Airtran pilots below all SWA pilots. How's that for a prediction?
Last edited: