Welcome to Flightinfo.com

  • Register now and join the discussion
  • Friendliest aviation Ccmmunity on the web
  • Modern site for PC's, Phones, Tablets - no 3rd party apps required
  • Ask questions, help others, promote aviation
  • Share the passion for aviation
  • Invite everyone to Flightinfo.com and let's have fun

Picken's $700 Billion Plan

Welcome to Flightinfo.com

  • Register now and join the discussion
  • Modern secure site, no 3rd party apps required
  • Invite your friends
  • Share the passion of aviation
  • Friendliest aviation community on the web
Nuke Power is great. No doubt. The problem is, the tree huggers hold up the approval process to build Nuke power plants. The other problem is the fact that it will take years to build them.


That is why we need to drill now: To allow time to get our nuclear infrastructure caught up to our power demands.

Oil is a short term power supply at this point. I've been hearing lately that that could have oil flowing from continental shelf in as little as two years because of a lot of the exploration was done prior the ban.
 
Why is it so complicated? Because drilling for more gas and oil and building more coal and nuclear plants are all dead ends. The energy source will run out, and they money is wasted. That saying, we DO need more nuclear plants in the short-term, to help us bridge from oil/coal to renewables.

I had to laugh at this one. the earth makes oil and coal EVERY DAY!!

I heard a mine engineer make a funny about a year ago. He told our group that we definately need to start looking for alternatives to "CLEAN" coal. Someone asked him "Why"? He said that at our current rate of mining, and it is FAST PACED, that Thunder basin would play out between 200 and 300 years from now.

Environmentalists wako's!! gotta luv'em.
 
Where did you get an education from?

Do you realize how many Windmills it would take to Power NYC?

Um... Windmills don't supply electrical power.
Windmills grind grain into flour. (dumbass)


To address your question.
NYC electrical power requirements vary from 4-5GW (that's billions of watts).

Using a baseline 5MW wind turbine, 1000 of them. 500 if the upgrade is made to 10MW turbines.
So, assuming 4 acres/per turbine, a 4k acre plot will do nicely.

CE
 
ANWR is about 60 miles from the pipline. They could have that stretch built in 2 months. They built the entire Alaska pipeline in 2 years. 30 billion just over the sites in ANWR that have been explored.

That oil does go to Japan, and Japan in return buys oil from Mexico or Canada for us. It's a matter of shipping, but things may have changed in the last ten years!! as of 94 that was the deal.

And for any of you that have never been to ANWR this is how you get there. NOT LIKE THE PICTURES FROM THE LIB NEWS.

Oil from Alaska ( NON ANWR, we can't drill there, it a park you know!!) So if you are thinking about taking the Family there for some outdoor fun, here is how you get there. Here is the road called the Dalton Highway or by locals known as the HAUL road. When I lived in AK, it was not open to the public. Only commercial vehicles. SO, if you want to go to ANWR and have a pick nick here is how you get there.
You start here !!! Note the road, this is the best part of the road, you can do at least 45-55 and make some good time.

xq9fde.jpg

Here is the fist hill, looks like no problem right, that hill is over a mile long and near vertical. The guy driving that truck is going about 75 so he can make it up the other side. I know, I was in the pass. seat. I was 8.
aacbbr.jpg

Oh, and it is just the start of the hills, or grades.
A truck would get one round trip on a set of tires.
2lc4kn7.jpg

Then you come to the Brooks Range. Here is the start. The grades here are worse then the above pics.
oicf2p.jpg

If you are in the range before June1st or after August 1st. You risk this
Look in the very back of the pic, see the spilt in the trees, that the road, a near vertical grade.
nyff9y.jpg

The Haul Road, Late August. Note a spare truck and 150 gal. of fuel and a snow blower. Don't want to be stranded here.
2ykkiro.jpg

If you get stuck in by weather at ANWR, this is how you get back home to Prudhoe Bay. Since it is still light, this pic was probably taken in Sept.
azffvs.jpg

Here is a test site at ANWR. Again around Sept/oct.
24pxj08.jpg

Here is a rig at Prudhoe Bay, again around Oct. NOTE, no Beautiful Mountains, no pristine streams, or meadows it's a barren waste land of frozen tundra.
2rqnip3.jpg

HERE is the best of it all. The Canadians are Drilling into ANWR from there side of the border, at a 45 degree angle and pumping it out. HAAAA the jokes on us !!!!
 
Um... Windmills don't supply electrical power.
Windmills grind grain into flour. (dumbass)


To address your question.
NYC electrical power requirements vary from 4-5GW (that's billions of watts).

Using a baseline 5MW wind turbine, 1000 of them. 500 if the upgrade is made to 10MW turbines.
So, assuming 4 acres/per turbine, a 4k acre plot will do nicely.

CE


If you believe those statistics... I have some great land on a steep hillside I am willing to sell you cheap!!
 
If you believe those statistics... I have some great land on a steep hillside I am willing to sell you cheap!!

Tell me, troll of trolls, which stats are incorrect?

Oh, that's right, you're just trolling.

The bridge is this way-------------->

CE
 

Latest resources

Back
Top