CFI2766
Well-known member
- Joined
- Dec 11, 2005
- Posts
- 1,293
Guys, I hate to be the resident d*bag here, but see I (and many others) told you so. We could have receive MUCH more than we got with the PBS agreement. Never accept the first anything, contract or otherwise. Now we're stuck with it and with any luck from out xjet family, we'll find a way to work through this.
Respectfully, we didn't accept the first attempt at PBS at ASA. There have been constant efforts and revisions to get both the Company and the software vendor to honor not only the language of the PBS LOAs and MOUs, but also the intent of how the ASA PBS system was designed. Our guys have been continually working to make PBS a positive for the pilot group from day one. I would argue that the PBS system at ASA is the best in the industy from a pilot's standpoint.
A general question for all:
Given that PBS was then and is now inevitable, what other PBS system in the industry would you rather work under?