acaTerry
SAPM
- Joined
- Dec 4, 2001
- Posts
- 2,393
Considering we are all on the same seniority list now, I urge you to reconsider your logic.
I get what you're saying, but the seniority list and mission requirements are different things and don't drive eachother in terms of furloughs. It's like saying you don't eat root crop vegetables because turnips taste bad. Carrots, beets, radishes....all root crops. Turnips, yuck, so I won't eat carrots.
They're not going to start having calling people in the XL back because a guy in the GLC wouldn't extend a day to do London to TEB on his would-be go home day.
There are simply two things involved:
1) Demand / needs. Do they see a need based on current requirements in fleets? This is where the missions of GLC and smaller fleets do not inter-relate.
2) Callback in senior order.
Even if things in GLC see a need for more, they just pull from our "overstaffed" small fleet pilots. You will see that they will have no trouble losing people to those Globals. They'll just move people around. Until they see need companywide, they simply will not call people back, no matter how much I or you or anyone else wants them to.
All we can do until they figure out the need for growth is call sick when sick and tired when tired. If we have guys flying when they shouldn't, it will never come back. It's like football: sooner or later (hopefully sooner), they'll run out of people who will carry the football when they need a rest and have to call back in the second string.
Last edited: