Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
It was uped to 18.
Oh really? Must have missed that memo.
OO will open its crew base in PHX on 1/1/12 for the CRJ 200 flying it will preform for US. Does anyone know how many planes will start on the first day and how long it will take to replace all the YV flying?
You guys are getting 38 900's ? I think that is what Mesa has, so you would need that to replace our flying. Wish you luck with that. Your days are number with the 100+ 200's
When Messa gets the contract cancelled, those 900s will have "operated by Skywest" stickers as quick as the mechanics can razor blade the Mesa stickers off. This industry sucks!You guys are getting 38 900's ? I think that is what Mesa has, so you would need that to replace our flying. Wish you luck with that. Your days are number with the 100+ 200's
When Messa gets the contract cancelled, those 900s will have "operated by Skywest" stickers as quick as the mechanics can razor blade the Mesa stickers off. This industry sucks!
Why does it suck if Skywest gets these airplanes? Skywest pays more than Mesa does. Do you work for Mesa?
The Mesa guys have families to feed. I work at SKYW and hate to see anybody(except gheyjhets pilots) lose their jobs/seniority. This industry is brutal.
So how about Skywest buys Mesa, pilots and all and integrates the seniority lists. Feel better now?