The 18 day can only be reduced by 10% per bid period I believe. It would take some time, if ever, to be able to ween everyone, or most, off it. And they can still force people onto it I believe.
as far as the GLC guys needing to extend to fulfill those Timbuktu crew swaps.....If there is some way to prove that an extended day WAS NOT voluntary, then I have no problem with that.
And further more, without the GLC extended days, there is still roughly 500 days that were voluntarily extended. Way too many.... Gutshot only assumed I was picking on the GLC guys. But then again if the shoe fits....... I've found that when someone is so quick to defend, he is most likely feeling he did something wrong (or in this case, his fellow GLC guys).
Not sure if you've(Gutshot) read the contract, 1.5.4(c) to be precise, but there is more than one reason for the scope language. Unless you've had blinders on this whole time, NJA CAN ABSOLUTELY sell-off as much as they want. Heck they can sell-off 100 days if they choose to. But everyday past 11 will result in some sort of recall. And that is directly proportional to the amount of sell-offs that occur.
In the end, changing the scope language is very bad. Both for the potentual for contract induced recalls, AND saving jobs currently still there.