PropPiedmont
Well-known member
- Joined
- Dec 13, 2005
- Posts
- 556
"We are planning to operate at the 53 level at least until April, when we may drop down to 52."
53 operating aircraft, we will have 1 operational spare, 2 aircraft offline getting major maintenance checks, and at some point 1 aircraft offline being painted in the new livery.
53+ 1 spare + 2 in heavy = 56. At some point 1 will be in paint (hence 1 spare or 2 in mx).
Bottom line is 53 aircraft requiring flight crews until April then 52. Those are the important numbers. Who gives a crap if we have 127 spare aircraft. It's all about how many aircraft require crews, right.
53 operating aircraft, we will have 1 operational spare, 2 aircraft offline getting major maintenance checks, and at some point 1 aircraft offline being painted in the new livery.
53+ 1 spare + 2 in heavy = 56. At some point 1 will be in paint (hence 1 spare or 2 in mx).
Bottom line is 53 aircraft requiring flight crews until April then 52. Those are the important numbers. Who gives a crap if we have 127 spare aircraft. It's all about how many aircraft require crews, right.
Last edited: