Cardinal
Of The Kremlin
- Joined
- Nov 25, 2001
- Posts
- 2,308
Are the schedules mostly out and backs?
There are a good portion of entirely outnback lines, a bit less than 10% of the bid packet. They tend to go really senior though, as most of the turns are built between 7 and 8 hours.