Quack
Reg Dunlop
- Joined
- Jun 12, 2004
- Posts
- 394
RJPilott and DoinTime are both correct. If you begin your day and are SCHEDULED to fly 29.9 hours in the previous 7 days, and for some reason go over block during ANY of your legs that day, you are still LEGAL to finish flying that day. So in essence, your buddy is the correct one. I wish that I could have been taken off legs the last day for all the times that I have been over block with 30/7 problems, but it doesn't happen that way!