Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I just hope the language is strong enough. For instance.
oLimit placed on the total number of four (4) day trips within a position to sixty-percent (60%).
oTrips will not be constructed to exceed four (4) days without consent of the Association
How about back-to-back 2-days or 2 and 3-days. How many loopholes are in this deal?
I just hope the language is strong enough. For instance.
o Limit placed on the total number of four (4) day trips within a position to sixty-percent (60%).
o Trips will not be constructed to exceed four (4) days without consent of the Association
How about back-to-back 2-days or 2 and 3-days. How many loopholes are in this deal?
Is anyone else wondering why they (ALPA) so hell bent on pushing this through right now, before February? What do our union officials know that they aren't telling us? PBS provides nothing to the company until the company starts to grow, so why are they saying this. PBS was thought of very poorly by the association until recently, so what is the general pilot group not seeing here?
Is anyone else wondering why they (ALPA) so hell bent on pushing this through right now, before February? What do our union officials know that they aren't telling us? PBS provides nothing to the company until the company starts to grow, so why are they saying this. PBS was thought of very poorly by the association until recently, so what is the general pilot group not seeing here?
There is nothing good in the TA....
I cannot believe our union let this stinker get by.
What operating system is being used or the name of the program?
I just hope the language is strong enough. For instance.
o Limit placed on the total number of four (4) day trips within a position to sixty-percent (60%).
o Trips will not be constructed to exceed four (4) days without consent of the Association
How about back-to-back 2-days or 2 and 3-days. How many loopholes are in this deal?
100% good points!
-You have imagine all the things which are NOT specially excluded in the agreement. Anything else, the company will absolutely try to get away with.
This whole agreement is nothing more than one major loophole, and a very easy way for SH to slide something into our collective a-hole.
-I'm sure it will pass-we have no shortage of idiots who think SH and BH are on our side. But it will not pass by virtue of MY VOTE-you can bet on that!
You will only get back to back 2 days under 3 conditions:
1. you purposely bid them
2. you are too junior to hold any other combination.
3. you don't bid enough trips to construct a line.
This isn't a deal where the company can build lines with back to back 2 days and claim it meets the contract. You build your own line.
I have to agree. There are too many loopholes. The company email that was sent out tonight was saying it's more efficient to have 80% 4 days. Now the new PBS language says 60%. Why not 60% now? Exactly! I will not be suckered into this. It's a "NO" vote for me.
I have to agree. There are too many loopholes. The company email that was sent out tonight was saying it's more efficient to have 80% 4 days. Now the new PBS language says 60%. Why not 60% now? Exactly! I will not be suckered into this. It's a "NO" vote for me.