Phlintstone
Gone Fishin'
- Joined
- Sep 12, 2012
- Posts
- 228
PCL,
Did the MEC not give the MC enough guidance in what they expected? Was the MEC never briefed about where that negotiations were headed?
These are the questions that I wonder how much the MEC was in control of their side of the process. Must of been some massive disconnect.
Massive disconnect is an understatement. IMO, there was NO direction given to the MC. I was flying with an MEC member when the news broke. Lets just say that the MEC member was learning of the details of SL9 (SLI-1) from other line pilots. LH or other MEC members would not return calls. You want to talk about a frustrated individual!
Phred