True story, for the most part, although not "the end" of 2014, but certainly not going to be done in March 2014 as previously-planned. Rather, in all likelihood, right up to the last minute in 2014.
The aircraft transition schedule has changed dramatically from what it was when we signed the SLI. There will be 19 or so 737's converted this year, then very few (if any) 737's for 2013. Instead, they will be converting most of the remaining 737's at AirTran to Raft and HF overwater aircraft and increasing the international flying on the AirTran side of the house.
In the meantime, in 2013, most of the 717's will come over with crews.
In early 2014, hopefully the reservation system will be up and running, all the SWA crews will be overwater certified (and hopefully ETOPS certified), the Hawaii flying will begin, and our international 737's will start transitioning over with crews to be completed end of 3rd Qrtr or into the 4th Qrtr 2014.
All subject to change... again... like everything else.