AK737FO
Well-known member
- Joined
- Nov 25, 2001
- Posts
- 368
Open a PDX base = to expensive, company is shying away from it.
SEA ETOPS base within a base = negotiations. Not enough time.
Grow LAX = to much soft time, not as efficient.
Grow ANC = short term answer to the problem coming in 2.5 months.
Last rumor I heard from the ANC LEC was about 20 new Capt seats in ANC with no reduction to SEA or LAX. That means a recall for some great people we all want back on the line.
Take note that the ANC base is suppose to have 80 F/O's. The BCP said that we actually have about 64 now due to mil leaves and what not. So we need to gain 16 F/O's off the street to get back to what we are suppose to be staffed at, before we even begin to talk about extra ETOPS flying that starts in March.
I think the tide has finally turned.
SEA ETOPS base within a base = negotiations. Not enough time.
Grow LAX = to much soft time, not as efficient.
Grow ANC = short term answer to the problem coming in 2.5 months.
Last rumor I heard from the ANC LEC was about 20 new Capt seats in ANC with no reduction to SEA or LAX. That means a recall for some great people we all want back on the line.
Take note that the ANC base is suppose to have 80 F/O's. The BCP said that we actually have about 64 now due to mil leaves and what not. So we need to gain 16 F/O's off the street to get back to what we are suppose to be staffed at, before we even begin to talk about extra ETOPS flying that starts in March.
I think the tide has finally turned.