BacktoAA
Furloughed and lovin' it
- Joined
- Mar 2, 2002
- Posts
- 24
I've stated in previous threads that I believe the recall rates/new hiring will depend on future aircraft deliveries at American. A new ask and answer on the company site shows our current delivery plans for the next two years. I believe that if these numbers start going up, which I think they will in the next six months or so, then people will be coming back.
Aircraft Deliveries
Q: How many 737/757/ 767/777 have we received in 2002, and how many are planned to be delivered in 2002/ 2003?
A: We will or have received 3 B777s and 7 B757s in 2002. There were no B737 deliveries. The plan for 2003 includes 6 B777 deliveries, 4 B737 deliveries and the 9 B767 replacements for the retiring TWA B767s.
Aircraft Deliveries
Q: How many 737/757/ 767/777 have we received in 2002, and how many are planned to be delivered in 2002/ 2003?
A: We will or have received 3 B777s and 7 B757s in 2002. There were no B737 deliveries. The plan for 2003 includes 6 B777 deliveries, 4 B737 deliveries and the 9 B767 replacements for the retiring TWA B767s.