LyodChristmas
Well-known member
- Joined
- Sep 15, 2006
- Posts
- 106
Starting in October the guy who builds the lines for Piedmont will also be building PSA's lines. I guess they are doing this so they could save some money.
Anyways, the lines came out last week and everyone thinks the pairings are pretty bad.
Basically to sum it up it, he put together a lot of flying that does not work well. 1 day trip get done early, followed by a two day that starts late - Most pairings have a lot more legs on back to back days then most people would like. I saw one that had 7 or 8 legs on the first day and 6 on the second with 9 hours of scheduled rest into a 4 leg day and a 5 leg day on the final day.
The lines come in 3 flavors this month too.... 12 days off, 13 and 14. Yippee!
I was just wondering what the Piedmont guys had to say about their schedules and if they have had any problems with this guy. Feel free to PM me too.
Thanks!
Anyways, the lines came out last week and everyone thinks the pairings are pretty bad.
Basically to sum it up it, he put together a lot of flying that does not work well. 1 day trip get done early, followed by a two day that starts late - Most pairings have a lot more legs on back to back days then most people would like. I saw one that had 7 or 8 legs on the first day and 6 on the second with 9 hours of scheduled rest into a 4 leg day and a 5 leg day on the final day.
The lines come in 3 flavors this month too.... 12 days off, 13 and 14. Yippee!
I was just wondering what the Piedmont guys had to say about their schedules and if they have had any problems with this guy. Feel free to PM me too.
Thanks!