And the SCOPE Problems begin...
IPA-UPS Discuss Scope, DHL Deal, Concern over 2 Pairings in 08-05 ANC MD-11 Bid Pack
Scope issues, the proposed DHL deal and the IPA’s concern about two pairings in the ANC MD-11 bid package (08-05) were among the topics discussed at today’s Scope meeting.
The EB tells IPNN Interactive they are in disagreement with the Company over pairing #s 400 and 409 which appear on lines 7 and 8 in the MD-11 ANC Bid Package and involve SJU turns out of SDF on ANC trips.
As you may recall, last summer the Association tracked the SDF-SJU-SDF trip and found that the pairing went over eight hours a considerable amount of time. The EB cautions that the same problem still exists, it has just been moved to ANC on another fleet.
If you are an ANC MD-11 crewmember and are assigned a SJU trip and go over eight block hours, you must have 18-hour FAR rest after that duty period as per the FAR Flag Rules.
As always, if you are scheduled for under eight block hours in a duty period and your flight exceeds eight hours, let the IPA know. Email
Additionally,
at the close of today’s Scope meeting, the EB requested a meeting with UPS to come up with a transition plan once the proposed DHL-UPS deal is finalized.