SafetyTheSeat
Well-known member
- Joined
- Dec 12, 2003
- Posts
- 116
7 is to low... Hurricanes, Sickness or a problem at home throws to many wrenches into the crewing issue. The crewing of machines should be a variable that is covered, as it is now one DNIF and the bird is out of the flow for at least 15 hours until one is airline in too replace that crew member. When the schedule is built 4 on the road per machine will cover any losses. What is a higher cost; two extra crew members or a sale off with a late pax leg?