There is no such thing as 17 days straight. It is 17 days total / month. You will get at least 3 days off between trips and will not be scheduled for longer than 6 days straight. I am on this schedule and I like it. Generally, you can get the desired days off on the 7/7 schedule, if you pay attention how you bid. Good luck.