Colgan Gets IAD UAL Flying
Looks like the flying that Shuttle America was doing with the Saabs is being taken over by Colgan.
10 more Saabs: $40 million
60 more pilots: $1.8 million/yr
Finally flying for United: Priceless
This is going to put Colgan near 500 pilots by the the time they're fully spooled up.
Shy
PS. Sorry about the DCA/IAD mixup.
Looks like the flying that Shuttle America was doing with the Saabs is being taken over by Colgan.
10 more Saabs: $40 million
60 more pilots: $1.8 million/yr
Finally flying for United: Priceless
This is going to put Colgan near 500 pilots by the the time they're fully spooled up.
Shy
PS. Sorry about the DCA/IAD mixup.
Last edited: