waterskier
Well-known member
- Joined
- Dec 31, 2005
- Posts
- 128
With contract in place, don't know if they will be furloughing.... Probably get some kind of agreement with ALPA to do reduced line building or something...
I would be ok with them lowering the guarentee from 75 to 50 or 60... avg. line with 15-20 days off...
I would much rather them do this and keep everyone here....
I would be ok with them lowering the guarentee from 75 to 50 or 60... avg. line with 15-20 days off...
I would much rather them do this and keep everyone here....