Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
CHQ is prob. around 1 year, XJT is running around 16-17 month for ERJ upgrade, and Comair most junior CA was just awarded and she was a 3/06 hire on the RJ. But you never know, upgrade changes at the drop of a nun's panties.....
I heard the upgrade time at American Eagle is like 7 years. Why is it so long, and what makes pilots want to stick around there?
Because Eagle has a flowthrough program with American, when 2001 hit and many of the flowthroughs were furloughed they came to Eagle and took a lot of CA's jobs and displaced those CAs to FO's. Untill this month American has not called back any furloughs. Jan is starting their first requalification class and upgrade times here are expected to drop to 3-4 years. Besides that Eagle is a very stable company to work for, great equipment and good bases. Eagle is owned by American so no need to worry about losing our contract with our mainline!I heard the upgrade time at American Eagle is like 7 years. Why is it so long, and what makes pilots want to stick around there?
Eagle is owned by American so no need to worry about losing our contract with our mainline!
yeah tell that to ASA, Comair, Piedmont, Allegheny, and PSA........
upgrade times here are expected to drop to 3-4 years.
Eagle is owned by American so no need to worry about losing our contract with our mainline!
CHQ is prob. around 1 year, XJT is running around 16-17 month for ERJ upgrade, and Comair most junior CA was just awarded and she was a 3/06 hire on the RJ. But you never know, upgrade changes at the drop of a nun's panties.....
1 year at CHQ. it seems low. can somebody else confirm?
The most junior guys and girls upgrading have been here over two years.
I heard the upgrade time at American Eagle is like 7 years. Why is it so long, and what makes pilots want to stick around there?
But Mesa is 8 months for the Dash-8 and about 6 for the 1900. It is comforting though that the FO's from the bridge program have 300 hours.Did I read this correct? Comair upgrades are about 8 months???
Did I read this correct? Comair upgrades are about 8 months???
One thing that I am sure of is that comair upgrade is not 8 years. Most Junior captain there was hired Feb of 2002, sounds more like 4-5 years to me.I think they mistakenly put "months" where they meant to say "years".
this year I'll make almost $50,000.