Why does DTW in particular (DCA sometimes too) submit PDCs with amendments that spell out the entire SID, radial to radial, and then tell you to fly the SID?
What the fug is the point of a SID if you're going to just spell it out anyway?
Recently, they submitted to us a PDC that told us to fly an amended route which was actually a real amendment to the SID, and then at the end of the entire thing, told us to fly the SID, which was a complete contradiction to the initial instructions. We had to call and bring it to their attention but really I mean wtf?
What the fug is the point of a SID if you're going to just spell it out anyway?
Recently, they submitted to us a PDC that told us to fly an amended route which was actually a real amendment to the SID, and then at the end of the entire thing, told us to fly the SID, which was a complete contradiction to the initial instructions. We had to call and bring it to their attention but really I mean wtf?