Ultra Grump
Mmmmm...beer....
- Joined
- Jan 22, 2005
- Posts
- 974
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Except that a new hire would most likely not have been here for a bid award, so would have to stay on the 18-day until the next bid period.
Hmmm.... kind of a catch 22, unless I missed something. You'll get it, but you have to bid it. But you can't bid it, because you weren't here.
Don't see any way around it; I stand corrected.
So if I understand this correctly that could mean a new hire would be looking at the 18 day schedule for possibly 4 months until the new bid period comes around?
So if I understand this correctly that could mean a new hire would be looking at the 18 day schedule for possibly 4 months until the new bid period comes around?
So if I understand this correctly that could mean a new hire would be looking at the 18 day schedule for possibly 4 months until the new bid period comes around?
Hey NJ guys. During a 7 day tour what kind of rest do you normally(if there is such a thing) get. I know it is 10 hours minimum but do you have time at a layover to go see the sites. I am a 121 guy and I enjoy getting out and seeing things such as the beach or sites at a good layover. Do they ever allow say a 24 hour layover at places or is it normally 10 hours or a little more?? Thanks