http://airconsumer.ost.dot.gov/reports/atcr06.htm
Click on the November '06 report. If you work for EV, the numbers aren't good.
I am sure that the runway construction has something to do with it (per company memo) but if you look more closely, there are over 100 airports that contribute to the on time data, so ATL can't be the crux of the problem.
Click on the November '06 report. If you work for EV, the numbers aren't good.
I am sure that the runway construction has something to do with it (per company memo) but if you look more closely, there are over 100 airports that contribute to the on time data, so ATL can't be the crux of the problem.