Palerider957
Well-known member
- Joined
- Jan 30, 2003
- Posts
- 975
Has anyone heard any new info. about when this rumway/terminal will be completed??
I heard it's 100' too close to the adjacent runways, so they'll need to do PRM approaches to make full use of it.
The last I heard Airtran was going to get the terminal and ASA would expand throughout C concourse.
I heard it's 100' too close to the adjacent runways, so they'll need to do PRM approaches to make full use of it.
The last I heard Airtran was going to get the terminal and ASA would expand throughout C concourse.