mudkow60
Well-known member
- Joined
- Jun 23, 2003
- Posts
- 544
Intreasting ILS last night-
On a LONG final, approach says they need to vector us in a box in order for traffic sequencing... a DC-9 behind us. After the 4th turn (as we did one right and all lefts to get on final) the DC-9 apperars right in front of us, on final. No traffic calls, and a late vortex warning call about 5 mins later when we are finally on final. Then, on short final (about 1 mile) the tower clears another heavy for take off, and tells us to slow our speed (which is not big deal, as we are in a helo). Just wondering if this was standard sequencing... my crew said I should give the controller a call, but it did not really bother me too much as I just thought the B squad was at the tower that night.
On a LONG final, approach says they need to vector us in a box in order for traffic sequencing... a DC-9 behind us. After the 4th turn (as we did one right and all lefts to get on final) the DC-9 apperars right in front of us, on final. No traffic calls, and a late vortex warning call about 5 mins later when we are finally on final. Then, on short final (about 1 mile) the tower clears another heavy for take off, and tells us to slow our speed (which is not big deal, as we are in a helo). Just wondering if this was standard sequencing... my crew said I should give the controller a call, but it did not really bother me too much as I just thought the B squad was at the tower that night.