PennEagle
Active member
- Joined
- Oct 4, 2002
- Posts
- 41
Sorry - more questions about Expressjet
1. Is there a training contract?
2. Current size of the pilot group?
3. Projected size of the pilot group?
4. Current status of flow through to CAL with CAL's current hiring. (I'm talking to lots of XJT crews and some tell me high numbers, some tell me none at all)
5. Current projected upgrade time, in light of the answer to question 4.
TIA
1. Is there a training contract?
2. Current size of the pilot group?
3. Projected size of the pilot group?
4. Current status of flow through to CAL with CAL's current hiring. (I'm talking to lots of XJT crews and some tell me high numbers, some tell me none at all)
5. Current projected upgrade time, in light of the answer to question 4.
TIA