Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
We finally got out blocks. Took 6 days of a continuous run. They had to open up our hard 16 day max to 17 and our designated block hrs to -9 to +1.
These are big hour swings. Now we have 270 blocks to run and our smaller bases have no problems. Just YYZ 320 FO.
PBS gives you a lot of flexibility but I've seen some weird things too. I've bid for some unproductive pairings to just see them go junior! The reasoning being it needs to spread things out - no one gives good answers. Too many moving parts.
Canned blocks suck but priority system is black and white. Although I think the jr pilots could really get screwed with a priority system.
I am very, very familiar with AdOpt PBS, as a trainer, user and administrator running solutions. The reason for the long run time for your 320 solution is the planner forced the solution to comply with a very narrow range of parameters (number of reserves, block hours per person, days off, etc.) versus letting the program do the math and suggesting the solution. If staffing is short the 'run time' can be very long when they do this. Sometimes it can run for 5 days - then fail. This suggests there is inadequate staffing for the parameters used. In my experience with management this may indicate they are using a manpower plan that does not reflect reality. Some one in management had the idea that 'we can tell the program to give us xx number of reserves and each block holder should credit yy hours with no leftover open time.' There were insufficient crews to achieve that.
The AdOpt program is a matrix algebra solution for solving simultaneous equations with multiple variables. The parameters the planner can specify are actually 'constraints.' When a solution takes a long time to run the constraints are set in a very narrow range. In this case a more systemic approach is to make the first run with all variables opened up to the maximum range allowed by the regs and contract. The solution should complete in a matter of minutes. After examining this solution the second run can be made with the constraint range narrowed down. Sometimes we make 20 or 30 iterations in this manner until we identify which constraints are limiting this month. We will then make 10, 20 or more additional solutions determining how limiting one constraint affects the other constraints. For example - by setting the minimum number of reserves high how much open time is created? As the constraints are narrowed down in tighter and tighter ranges the run times increase and pilot bid preferences are increasingly denied. Sometimes management does not get the reserves they want unless they leave a lot of open time to be paid at premium pay.
When I see a planning group do what yours did it may suggest they do not have a complete understanding of how the program works or how to use it. Too many management teams think they can use PBS to make their manpower plan work. That usually fails. Smart ones eventually learn it is actually the other way around. PBS should be used to determine how many crews you need to minimize payroll costs. Some management groups never get it.
Hi sinkrate.
Great response. Better than anything our PBS committee can tell us. We've been asking for the straight goods to deflect the blame from them but nothing like the substance you've provided. It sounds like it's unrealistic mgmt constraints.
We have a step by step solutions process as defined in our contract. Hourly max is generally -5 to +1 of the defines base amount but can be expanded up to -10 to + 1. The max day can also be opened from 16 to 17 days. We have some unproductive 3 day parings at 9hrs - these go jr and make solutions difficult. We also use an Optimizer that is employed to help find solutions - never a good thing when you hear the Optimizer has been employed.
It sounds like the mgmt constraints requirement - which the pilots have no control or say over - can lead to some of the longer runs. Is that safe to say? Or do the pilots constraints cause these problems too.
Thanks for your explanation.
Probably the best feature of PBS is the ability to Load Beginning or Load End of lines. With that, and if you're ok with working like a dog other times, you can build a vacation into every other month at the transition. I've never seen paper bids that could reliably do that.
Is ignorance your only defense for EVERYTHING???Never used pbs so I won't say anything, accept that management wants it.