Let's be optimistic for a moment:
1) Labreque is leaving...........(if he actually is showing his face @ the airport probably not)
2)Losing DAL owned a/c, but getting more "insert any a/c type" (ATR's) for a net gain of 1 a/c
3)The NMB has contacted our company and scared the bejesus (offered a proffer etc etc) out of them and they are running to the pilot group to smooth things over
4)The construction on C concourse is moving along but you are going to be without a clean bathroom or access to the ramp for 2 months
5)DAL is very unhappy with our performance and we are in dire starights to keep the contract with them.....
Oh wait, Optimistic Optimistic, Optimistic...Sorry
It's hard to be Optimistic when the company you work for does everything in their power to keep you down and nothing in their power to actually help you.