www.
SoCo Guy
- Joined
- Mar 18, 2006
- Posts
- 821
FYI.......
During Initial Open Time - start posting your trips for swap and drops ASAP. There will be red arrow days since they have not awarded RES final lines. You still will be able to swap with IOT during this time frame and the red arrow days will be removed once the RES lines are loaded.
During Initial Open Time - start posting your trips for swap and drops ASAP. There will be red arrow days since they have not awarded RES final lines. You still will be able to swap with IOT during this time frame and the red arrow days will be removed once the RES lines are loaded.