No Delay
Well-known member
- Joined
- May 26, 2004
- Posts
- 484
When setting preferences, if your first choice is a Sunday start followed by Monday start. Can that be done in one preference? If all other criteria is met, does it pick in the order that you listed start days or do you need in to separate each into different preferences?
Example
Pairing report >= 0900 | Pairing Length = 3 days | Departing on Sun, Mon, Wed
Vs
1. Pairing report >= 0900 | Pairing Length = 3 days | Departing on Sun
2. Pairing report >= 0900 | Pairing Length = 3 days | Departing on Mon
3. Pairing report >= 0900 | Pairing Length = 3 days | Departing on Wed
Example
Pairing report >= 0900 | Pairing Length = 3 days | Departing on Sun, Mon, Wed
Vs
1. Pairing report >= 0900 | Pairing Length = 3 days | Departing on Sun
2. Pairing report >= 0900 | Pairing Length = 3 days | Departing on Mon
3. Pairing report >= 0900 | Pairing Length = 3 days | Departing on Wed