Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
ANA has been hiring through PARC and CREW for a while. Not a shock we lose it. More suprised we didn't hose it up faster.
Not that I mind. I don't think that the contract was that cost effective. All those personnel over there supporting one acft... Has this been made public, I have seen nothing in black and white. What are your sources?
Personally I think that plane would be better utilized in MIA and LAX anyway.
Not that I mind. I don't think that the contract was that cost effective. All those personnel over there supporting one acft... Has this been made public, I have seen nothing in black and white. What are your sources?
Personally I think that plane would be better utilized in MIA and LAX anyway.
We did not hose anything up. We had a few bumps here and there, but for the most part kept the acft on schedule.
It is actually JFK-LGG (Liege, Belgium), five days/week and on Tues and Sat it stops in Halifax on the Eastbound leg.
Having a crew member show up 3 hours late in China for departure is hosing things up in anybody's playbook. Crossing into Chinese airspace without permission is hosing things up. Sticking it to ANA on start up costs is hosing things up. Need me to go on? ANA had enough and used the economy as an excuse to dump us.