Can anyone tell me what the specifics of this new RFP is? (like did they say it was 50, or 70 or more seats and/or what the new growth airframes are going to be?)
The main reason i ask is because Jerry Atkin specifically said last week that ASA did not bid on the RFP for 70 seats or greater because "our cost structure is too high", he didnt say if ASA bid at all on any 50 seat flying, so if the RFP didnt include any smaller airframes, he basically just told us zero growth for ASA.
The main reason i ask is because Jerry Atkin specifically said last week that ASA did not bid on the RFP for 70 seats or greater because "our cost structure is too high", he didnt say if ASA bid at all on any 50 seat flying, so if the RFP didnt include any smaller airframes, he basically just told us zero growth for ASA.