Heyas,
I'm guessing all the problems/issues will be miraculously solved when the TA passes.
At NWA we were told that even if we wanted to fly the 175s at the mainline, there was a 7 year backlog. As soon as the BQ TA was signed, CPZ got them in a matter of months.
Funny how that works.
Nu