argpilot
Active member
- Joined
- Sep 5, 2004
- Posts
- 28
WHat do they mean by 1200
i was looking at the regional requirements, and most ask 1200 total and 200 multi engine time, I do meet requirements i have little over 1400 hours but most of my time is not cross country, nor IFR, would that be a problem, or as long as have over 1200 with 200 ME , its enough for them?
or should i meet part 121 minimun requirements?
Thanksss
i was looking at the regional requirements, and most ask 1200 total and 200 multi engine time, I do meet requirements i have little over 1400 hours but most of my time is not cross country, nor IFR, would that be a problem, or as long as have over 1200 with 200 ME , its enough for them?
or should i meet part 121 minimun requirements?
Thanksss