U.S. implementation timetable
The U.S. FAA ADS-B implementation is broken into three segments each with a corresponding time line. Ground segment implementation and deployment is expected to begin in 2009 and be completed by 2013 throughout the National Airspace System. Airborne equipage is user driven and is expected to be completed both voluntarily based on perceived benefits and through regulatory actions (Rulemaking) by the FAA. The cost to equip with ADS-B Out capability is relatively small and would benefit the airspace with surveillance in areas not currently served by radar. The FAA intends to provide similar service within the NAS to what radar is currently providing (5NM en route and 3NM terminal radar standards) as a first step to implementation. However, ADS-B In capability is viewed as the most likely way to improve NAS throughput and enhance capacity.
FAA segment 1 (2006-2009)
ADS-B deployment and voluntary equipage, along with rule making activities. Pockets of development will exploit equipment deployment in the areas that will provide proof of concept for integration to ATC automation systems deployed in the NAS.
FAA segment 2 (2010-2014)
ADS-B ground stations will be deployed throughout the NAS, with an In-Service Decision due in the 2012-13 time frame. Completed deployment will occur in the 2013-2014 time frame. Equipage is expected to begin after the proposed rule is finalized in around 2010.
- Airport Situational Awareness – A combination of detailed airport maps, airport multilateration systems, ADS-B systems and enhanced aircraft displays have the potential to significantly improve Final Approach and Runway Occupancy Awareness (FAROA).
- Oceanic In-trail – ADS-B may provide enhanced situational awareness and safety for Oceanic In-trail manoeuvres as additional aircraft become equipped.
- Gulf of Mexico – In the Gulf of Mexico, where ATC radar coverage is incomplete, the FAA is locating ADS-B (1090 MHz) receivers on oil rigs to relay information received from aircraft equipped with ADS-B extended squitters back to the Houston Center to expand and improve surveillance coverage.
FAA segment 3 (2015-2020)
ADS-B In equipage will be based on user perceived benefit, but is expected to be providing increased situational awareness and efficiency benefits within this segment. Those aircraft who choose to equip in advance of any mandate will see benefits associated with preferential routes and specific applications. Limited radar decommissioning will begin in the time frame with an ultimate goal of a 50% reduction in the Secondary Surveillance Radar infrastructure.