Ive been digging through the AIM looking for it, all I can find is there is a 2000' equidistant no transgression zone(NTZ) between the parallel approach courses, but this is for simultaneous parallel apps with RW CLs spaced 4300 apart or more. Simultaneous close parallel(PMR) ops are for apps with RW CLs less than 4300 apart, and all I can find for this is the the minimum 3 miles radar sep, and 1000 vertical sep during turn on to close parallel final app course.