legendskid_44
Need a job
- Joined
- Apr 22, 2007
- Posts
- 85
so i'm looking to get my multi commercial and instrument rating and fast. i have over 170 log in the book and i'm single instrument rating at the moment. Phoenix East is 141 and can get me done in about 2 months and ATP is part 61 and get me done in 90 dayz. only problem is that i need to get done quick. any suggestions?![Confused :confused: :confused:](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)