LJ45
Well-known member
- Joined
- Jan 2, 2005
- Posts
- 1,080
There were 223 G200 deliveries through 31 January 2009. The G200 won't be going "Bye-Bye" until last quarter 2011 when G250 deliveries begin.
...and you're right, the G250 will be an outstanding growth derivative of the G200. It has an all-new, advanced transonic wing design that has been optimized for high-speed cruise and improved takeoff performance. At maximum takeoff weight, the G250 can take off from a 5,000-foot runway. Its 3,400-nautical-mile range means the G250 can fly nonstop from New York to London.
The G250 will have a Rockwell-Collins Pro Line Fusion Planeview 250 cockpit and "Green" 7,445 pound/thrust Honeywell HTF7250G engines. The jet will also feature the largest-in-class cabin with 19 windows and a two-windowed vacuum toilet equipped lavatory.
De-icing/anti-icing will be accomplished with a hot wing and stopping will be augmented by auto-brakes. I think it will be a great airplane.
I agree, the 250 will be nice airplane and better than the CL30. Now back to the sales pitch, how long did it take to sell 223 G200 ??