NCFlyer
Well-known member
- Joined
- Apr 30, 2002
- Posts
- 320
To all PDT pilots looking at the APR 07 bid, please check to see that the information that you are using is accurate. It seems that there was an error in how the DH pay was computed and totaled into some of the crews so the entire bid had to be rerun on Friday morning.
It is my understanding that several of the bid lines in each base had their total credit changed after the DH credit was corrected.
Also as I understand it, none of the trips or lines have been changed only the calculated pay credit for the individual trips that were incorrect and that impacted the total credit for the month as displayed on the published bid package and the original bids that were posted on the PDT web site.
The most current data should show "PROCESSED ON Friday 03/09/07".
It is my understanding that several of the bid lines in each base had their total credit changed after the DH credit was corrected.
Also as I understand it, none of the trips or lines have been changed only the calculated pay credit for the individual trips that were incorrect and that impacted the total credit for the month as displayed on the published bid package and the original bids that were posted on the PDT web site.
The most current data should show "PROCESSED ON Friday 03/09/07".