From two pretty reliable sources, Alaska is exercising its options to buy on 25 737-800's. That coupled with the 7 or so -400 they want to get rid of means a net gain of approximately 18 aircraft over the next couple of years. Also, they want all of the furloughs back yesterday, but are trying for a timeline of June '11 with hiring through the summer and fall. I truly hope this rumor pans out. With all the action in the training dept. lately, it seems as if it might be.
CP.
Don't mean to be Captain bringdown...but wouldn't this be out of "character" for management. If we did place a large order for aircraft, wouldn't it make more sense to simply continue there MO of "growth" by replacing smaller aircraft with larger aircraft. I don't believe we will see a significant increase in airframes until we are flying all 800s/900s plus the freighters/combis. I also think that Horizon will take over SE with a daily freighter for cargo.
As far as everybody back by summer. We are Bringing back 36 by April. That would leave about 60 to bring back in 2 months which is 25-30 month which is more than we were able to train during the peak of hiring. Not to mention any loa/mil guys coming back.
Anyway, I hope I am wrong but these are the rumors that make the most sense to me.
Last edited: