MILF Hunter
Well-known member
- Joined
- Nov 6, 2003
- Posts
- 165
There have been some interesting posts on another forum about what went wrong with Muse/Transtar. That was way before my time. From tof, it appears their MEC tried to stop the SLI process because they weren't satisfied with the direction. Then SWA pulled the rug out from under them? Can anyone hear shed any light on the subject? Thanks!