Jet_Driver
"There I was...."
- Joined
- May 5, 2005
- Posts
- 126
While it is true the most Junior CA was hire in 2000, don't forget they didn't hire from 9/01 through 11/03. They also had furloughs to call back. This "slump" will not affect upgrades much longer. We saw a lot of growth at Eagle in 2004-05, but we also took on 300+ flow back pilots, who are leaving all the time. They should all be gone by next year. Not only this, but the Flow Through pilots will start to leave too. (this is an impending grievence)
Net result, quicker upgrades for the guy getting hired now than the guy who hired on in 2000. I was hired in 2004 and expect to be a CA next year (If I don't leave and go somewhere else)
The latest vacancy bid shows 96 EMJ FO slots for ORD. A person could essentially be holding a line their first full month after IOE if he were on the senior end of that class.
Now is the time to go to Eagle. Life is getting better all the time.
Net result, quicker upgrades for the guy getting hired now than the guy who hired on in 2000. I was hired in 2004 and expect to be a CA next year (If I don't leave and go somewhere else)
The latest vacancy bid shows 96 EMJ FO slots for ORD. A person could essentially be holding a line their first full month after IOE if he were on the senior end of that class.
Now is the time to go to Eagle. Life is getting better all the time.