Depends. One of the delivery schedule, two, the future of Airways, and three the fate of PSA if Airways does tank.
With the projected delivery's right now, all original PSA FO's that were here before the jet's started to arrive should be Captains by March of 2005. That should cover the required Captain positions for the aircraft on order. If we get more, the upgrades would continue. If we don't then it's any one's guess how long the upgrade would be.