W wildcard Well-known member Joined Jul 20, 2003 Posts 47 Feb 18, 2009 #1 of 5 Hey know times are tough for everyone looking for learjet job in DFW area. Lrjet and LR-60 type and current in the 60. Tks.
Hey know times are tough for everyone looking for learjet job in DFW area. Lrjet and LR-60 type and current in the 60. Tks.
stupidpilot Registered Moron Joined Sep 6, 2005 Posts 10,813 Feb 21, 2009 #2 of 5 Good luck man. There are alot of us here that have trying for a while with a big fat NADA! Times be tough!
Good luck man. There are alot of us here that have trying for a while with a big fat NADA! Times be tough!
CapnVegetto The Prince of all Saiyans Joined Mar 24, 2005 Posts 1,981 Feb 22, 2009 #3 of 5 Thought I saw Bombardier advertising for instructors at their DFW facility. From what I hear it's a decent place to work, unlike CAE Simuflite.
Thought I saw Bombardier advertising for instructors at their DFW facility. From what I hear it's a decent place to work, unlike CAE Simuflite.
EAW0506 Member Joined Mar 4, 2006 Posts 14 Mar 10, 2009 #4 of 5 I saw this on another board. If you live in the area you may already be on this, but if not I hope it helps. ATI Jet 7007 Boeing Drive ELP 79925 Open their web site and click on "careers." Pax and EMS flights 45-70 hours/mo Medical, dental 10 vacation days 6 sick days IRA with 3% match 7 days off/month $2.75/hour per diem Eagle based crews receive additional $5,000 COLA
I saw this on another board. If you live in the area you may already be on this, but if not I hope it helps. ATI Jet 7007 Boeing Drive ELP 79925 Open their web site and click on "careers." Pax and EMS flights 45-70 hours/mo Medical, dental 10 vacation days 6 sick days IRA with 3% match 7 days off/month $2.75/hour per diem Eagle based crews receive additional $5,000 COLA
EAW0506 Member Joined Mar 4, 2006 Posts 14 Mar 10, 2009 #5 of 5 Nevermind, I just realized it was in the El Paso area not DFW. Sorry about that.