Hold your shorts here!
You have to look at percent of parts built in the U.S. as well as assembled in the U.S. versus abroad. You will find that Sikorsky out sources quite a bit of their parts and production side. They have partners with Brazil, China, Japan, Spain and Taiwan. The percentage of parts Sikorsky has manufactured outside the U.S. is very close if not more to the percentage US101 is using. Frankly, Sikorsky was fibbing about an "all American" helicopter. Their tacticts backfired with their pricey advertisement campaign when observers quickly pointed out their high overseas dependence for production requirements.
Another problem arose in Dec of 2001 when the requirments changed due to mission enhancements. The VH-3D's (S-92) performance margines were quickly exhausted. U.S. 101 has maintained greater performance margines and proven technology from the 101 project and may have sealed the bid. It has a larger cabin, longer range, greater payload and a proven combat record. Additionally, the aircraft had to be C-17 compatable which the U.S. 101 was. The aircraft is also using the new GE-T700 engines that produce the highest thrust which have yet to be integrated into the VH-3D.
Personally, I would have liked to see an "all American" aircraft win. But we don't have one. Boeing/Bell would have been the closest that would fit the bill (CH-47 or V-22). So don't jsut kick back and armchair quarterback the idea that the U.S. Gov has gone outside the U.S. for the aircreaft. These aircraft will be 100% built and maintained here in the good old U.S. of A.
On another note, the total package price includes a whole lot more than rogue is thinking. This includes a maintenance, spare parts, publications, tech reps, and priority manufacturing package,as well as additional support for some time to come. Not just research and procurement.
If you need to know where the info came from, find a copy of Roror&Wing, Rotorcraft report, page 8, Dec 2004.